0701001 - Brooklane Drive
Approximately 1 mile of roadway
widening from 2 to 5 lanes.
0606005-
Abernathy Road
Rehab of Abernathy Road. Road suffered severe damage during the
construction of McAshan Road due to trucks hauling material from
borrow pit on this road. Work consist of digging out and
repairing areas of roadway that have suffered base failure
0401010 - Camp Oliver Road
Drainage
Drainage Structure, Pipe replaced with culvert
0702005 - Sealy Ann Mountain
Road
Clearing of overgrown right-of-way, drainage upgrading,
roadway rehabilitation.
9710001 - McAshan
Road, Phase 1B (New Bridge)
0105003 - Nancy
Ann Bend Road
Straighten and widen a portion of this road by moving the road
over to an abandoned coal hauling road that runs parallel to the
current county road. Project consist of replacing existing
culverts, rehab base and pave.
Topics Site
VIII-4 - South Lorna Rd. @ Galleria Blvd.
Roadway, Intersection & Signal Improvements.
Grade, drain, base & pave.
Topics Site
VIII-6 - Camp Oliver Rd. @ Toadvine
Roadway, Intersection & Signal Improvements.
Grade, drain, base & pave.
0410009 - Lindale
Rd.
Realign existing 2 lane roadway to remove several curves. New
road will be 2 lane.
Topics Site VII-3
- Heflin Ave. @ Riderwood
Roadway, Intersection & signal improvements. Grade, drain, base
& pave
Topics Site VII-2
- Old Bankhead Hwy @ Union Grove Rd
Roadway, Intersection & signal improvements. Grade, drain, base
& pave
Topics Site VII-1
Mt. Olive Rd. at Newfound Rd.
Roadway, Intersection & signal improvements. Grade, drain, base
& pave
0103001- Alliance
Road Bridge.
To replace bridge over Locust Fork of Warrior River
9808001- Morgan
Rd.
Widen to 4-5 Lanes from I-459 to South Shades Crest Rd.
0607011- Bagley
Rd. at Bankston Rd. Warning Signal
Advance warning signal improvements for traffic entering the
Bagley Rd from Bankston Rd.
0511006 -
Blossburg Road
Widening from Main Street, Graysville to Corridor X. Widening 2
lanes to 5 lanes. Stream involved. Intersection, service roads,
driveways. Realignment at 7th Street SE.
0612021 - Oak Grove Park
Install new chain link fence.
0703006 - Mud Creek Cross Drain @
Groundhog Road
Replacement of old WPA culvert that had been extended before.
Current design would not allow widening that was needed to
create shoulder for safety.
0703007 - Mud Creek Cross Drain @
Indian Valley West
Replacement of deteriorated 42" corrugated metal cross drain and
24" cross drain approximately 75 feet from the larger one.
|